In conversation
Florian Zierer
Berlin International University of Applied Sciences
Berlin, Germany
8th October 2024
Florian Zierer will be in conversation at the Berlin University of Applied Sciences on 8th October 2024, introducing the practice's recent projects with existing buildings.
Whether consciously or unconsciously, our works are always involved in a dialogue. Whether they are created in dialogue with existing architecture, as extensions or conversions, or as new buildings in urban space or in a landscape, what all projects have in common is that they seek and need a conversation with the present and its conditions. Recently, projects have emerged that illustrate the intensity of the conversation in different ways. We would like to present some of these projects and explain the processes involved.
Related news
Caruso St John has won a RIBA International Award for its ‘innovative and joyful’ conversion of the Veemgebouw in Eindhoven, which has transformed the 1940s Philips electrical company warehouse into a modern mixed-use urban building.
Royale Belge has won a European Heritage / Europa Nostra Award for Conservation and Adaptive Reuse. Overseen by the European Commission in partnership with Europa Nostra, the awards celebrate and promote the highest standards in heritage interventions, research, and education, training and awareness-raising, as well the longstanding dedication of professionals and volunteers.
Royale Belge has won plaudits at the annual MIPIM real estate fair in Cannes. The project was shortlisted in two categories at the MIPIM Awards, Best Conversion and Best Mixed-use, and triumphed in both.
The project for the renovation of the Royale Belge in Brussels has now completed. An opening event was held on 28th June, hosted by Mix – a new venue encompassing a hotel, restaurant, gym and co-working space. The food hall and terrace on the ground floor has also opened, creating a new destination for the Watermaal-Bosvoorde area of Brussels. The project’s diverse functions are brought together by the new hall and staircase which creates a new centrepiece for the iconic building.
Marco Biagi explores the approach of international practices to decommissioned industrial buildings. Citing a range of recently completed projects, including Caruso St John's Veemgebouw, he discusses the rise of adaptive reuse. Biagi explains through our urgent environmental crisis, the reuse of industrial plants and depots is more necessary than ever, offering a new challenging creative outlet for contemporary architects.
Renovation work continues at the Royale Belge in Brussels. The façade works have been completed, reinstating the original building’s iconic golden glass. The tower’s office floors and hotel rooms are nearing completion, with tenant fit-outs underway. Structural works for a new atrium have been completed, with two curved stairs connecting multiple functions across three floors. The atrium is naturally lit from above, with a large rooflight overhead that completes the pattern of the original diagrid roof.
Caruso St John's Veemgebouw building is reviewed in the Architects Journal's Climate Crisis issue. Rob Wilson explores the project's respectful and flexible retrofit of the listed 1940s warehouse, part of the former Philips factory complex. The building now provides a mix of housing above a range of public and commercial spaces.
Construction has completed on Caruso St John's redevelopment of the Veemgebouw, a former Philips factory building on Strijp S in Eindhoven. The monumental industrial site in the Brainport region of the city is now the centre of a lively urban environment.
The design repurposed the existing floors to create a varied mixed-use structure; including workspaces on the upper floors, a car-park and a food-hall on the ground floor. The project also included the addition of 38 rooftop studios and maisonettes.
The mast has been craned into place on top of the Veemgebouw. The design features integrated LED lighting, continuing the local tradition for night time illuminations across the city's skyline. It echoes the mast that stood on top of the building in its previous incarnation as a factory for the Philips electrical company.
Renovation work continues at the Royale Belge in Brussels. The façade replacement of the tower has been completed, which replicates the original design but with an expanded insulation zone. Work on the podium façade is underway, with a series of new openings connecting it to the landscape. A large cut has been made in the base of the building making way for the new atrium and four new columns to support the existing diagrid roof have been added.
Lecture
Reuse, Recycle
Lessons in Sustainable Architecture
Eindhoven, The Netherlands
10th February 2022
Peter St John is taking part in TU Eindhoven's lecture series, Lessons in Sustainable Architecture. His talk, Reuse, Recycle will discuss the practice's renovation projects with a focus on their sustainability and design process.
The landscape and interiors of Caruso St John's Veemgebouw Strijp S are now taking shape. The top floor of new construction contains 40 apartments, arranged around a landscaped courtyard, with external facades of curving brickwork that form a new dramatic top to the building.